Tuesday 31 March 2009

Moving into a new premises!

We have finally got around to moving into new premises in Seaton. Its a great location, being near to walk or cycle. Our previous workshop and storage is some miles away and at a difficult location to find. Now we are easy to locate.
Unit 2 Harbour Road, Seaton, Devon, EX12 2HA

Couple of pictures before we move in and rack it out for stock, benches for test and assembly, etc

Sunday 15 March 2009

Exeter Eco Fair

We took a small table at The the first Exeter Eco Fair with Low Carbon Exeter.

A small fun event, that will grow as time passes.

Not so many traders at this first event, but its early days and word has to spread around Exeter ..

We had loads of questions for renewable energy...

Monday 2 March 2009

Tested and commisioned . Its so good :)

Popped back in to run some final checks, take some readings and generally see how the system has got on over the weekend. Its clocked up 75kWh over the 2 days during the weekend of mostly cloudy with a little bit of sun here and there. Very encouraging!

I spent some time on site this morning, as I had some network cabling to finish, and a whole bunch more pictures to take now the sun is out for today. .. By the time I had left at lunchtime, another 20kWh had been generated. Its such an incredible system, the customer is going to notice a major difference in their power bills, plus of course the building occupiers have taken a huge step toward reducing their carbon footprint.



Two pictures taken with a super wide angle lens to get everything in on one shot. Perspective is a little distorted though.
The modules on the roof and inverters mounted inside the electricity switch cupboard. 3 @Fronius IG inverters.